International Engineering
The company has completed 65 projects in total, including 12 substation projects; There are 35 110kv-500kv transmission line projects, with a total length of 1160km; 20 low voltage distribution projects. There are 18 projects under construction, including 3 substations; There are 7 110kv-500kv transmission line projects, with a total length of 12km; 3 low voltage power distribution projects.
上一页 12345678...1617 下一页